Pig shed manure cleaning machine

Short Description:

Scraping manure machine installation, make full use of the fixed point of pig discharge behavior, realize the clean and clear the class: automatic control system, timely dung, reduce water flushing ring, reduce water consumption and wastewater discharge, realize the waste water and solid liquid separation, reduce main pollutants such as COD concentration of sewage, feces clear in time, the pig growth environment, reduce the prevention and control. In the pressure of the shell, avoid caused through the feces mix hidden trouble of disease transmission tool.


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    Installation Brief:

    图片2
    图片3

    1.The main engine and casters with concrete pouring to firm and reliable, to prevent loose operation.
    2. Tight rope: 2 people to cooperate, the rope head fixed to the first corner on the shaft, the rope around the rest of the round corner again around good rope roll, one control switch, the other one pulling rope head, with the host to pull the rope tight, find a good length of the rope, will be extra string truncation, and then to fasten the rope head even in addition a rope, tied 8 galvanized wire are available, and then put the corner on the wheel and axle fixed rope loosen, Place the scraper according to the position, and fix the rope and the scraper iron frame firmly.
    3.Control box accessories travel switch (limit device), fixed at the end of the dung ditch (the location of the scraper dock), the location to scrape the dung convenient collision is appropriate.

    图片4
    图片5

    4.For sometimes comprehensive protector switch and motor control box, set the switch when installation manual mode to close position, prevent the switch to start, when the motor suddenly accident, operation after installation and debugging good, then switch when switch instructions set on time, due to the electric box is equipped with integrated motor protector, turn on the machine before installation and debugging, Otherwise, the motor comprehensive protector defaults to the state of missing phase, the electric box contactor will not pull, the motor comprehensive protector adjustment according to the motor comprehensive protector manual.
    5. The traction rope should be checked irregularly because of its scalability, and adjusted in time if it is loose and skidding.

    Welcome to Discuss these Issues with us! 

    Facebook

    WhatsApp

    Line

    Zalo


  • Previous:
  • Next:

  • Write your message here and send it to us