Pig shed manure cleaning machine
Installation Brief:
1.The main engine and casters with concrete pouring to firm and reliable, to prevent loose operation.
2. Tight rope: 2 people to cooperate, the rope head fixed to the first corner on the shaft, the rope around the rest of the round corner again around good rope roll, one control switch, the other one pulling rope head, with the host to pull the rope tight, find a good length of the rope, will be extra string truncation, and then to fasten the rope head even in addition a rope, tied 8 galvanized wire are available, and then put the corner on the wheel and axle fixed rope loosen, Place the scraper according to the position, and fix the rope and the scraper iron frame firmly.
3.Control box accessories travel switch (limit device), fixed at the end of the dung ditch (the location of the scraper dock), the location to scrape the dung convenient collision is appropriate.
4.For sometimes comprehensive protector switch and motor control box, set the switch when installation manual mode to close position, prevent the switch to start, when the motor suddenly accident, operation after installation and debugging good, then switch when switch instructions set on time, due to the electric box is equipped with integrated motor protector, turn on the machine before installation and debugging, Otherwise, the motor comprehensive protector defaults to the state of missing phase, the electric box contactor will not pull, the motor comprehensive protector adjustment according to the motor comprehensive protector manual.
5. The traction rope should be checked irregularly because of its scalability, and adjusted in time if it is loose and skidding.